Essential steps for the processing of construction plans in Costa Rica

The process for the preparation and approval of construction plans is a key stage in any construction project, whether residential or institutional. In Costa Rica, complying with certain procedures, studies and permits is the basis of the requirements, ensuring the viability and safety of the work.

At Arkcon, we are ready to provide you with the necessary support, that is why we detail the essential phases to obtain construction plans in Costa Rica with efficiency and quality.

1. Preliminary studies

Before starting to draw up the plans, it is essential to carry out preliminary studies to determine the feasibility of the project and its impact. This stage includes:

  • Acquisition of the lot and verification of its registration in the National Registry.
  • Review of rules and regulations applicable to the construction zone.
  • Availability of public utilities such as water, electricity and telecommunications.

In addition, it is important to take into account the completion of technical studies such as environmental impact, geotechnical and noise emission studies. Once the respective studies have been approved, the construction plans can be drawn up.

2. Preparation of construction drawings

Once the respective information from the preliminary studies is ready, it is possible to proceed with the realization of the construction plans, for this it is important to take into account the following steps:

  • Architectural design and definition of space distribution.
  • Structural, electrical and mechanical plans, adjusted to current regulations.
  • Use of advanced technology, such as drone photogrammetry, for accurate topographic surveys.

3. Approval of plans with regulatory agencies

With your idea ready and the plans drawn up, the following is the review of the same for their due approval before the corresponding entities, which are:

  • Federated College of Engineers and Architects (CFIA), where the technical plans are validated.
  • Local municipalities, which issue construction permits.
  • Other institutions, depending on the characteristics of the project (SETENA for environmental impact, AyA for water availability, etc.).

4. Execution of the work

With the approval of the ready plans, the construction process begins, for this it is important to take into account the payment of expenses, such as social security, workers’ payroll, among others. Also, you must take into account:

  • Payment of policies and permits required prior to the start of work.
  • Supervision and control by responsible architects and engineers.
  • Periodic inspections of structural and safety compliance.

5. Closing of work and handover of the project

Finally, the delivery of the house is reached, where the final inspections of the construction and the formal closing of the project are carried out.

  • Final inspections to verify compliance with regulations.
  • Issuance of completion certificates and warranties.
  • Official handover of the construction and registration of the completed work..

Rely on experts for your blueprinting process